Home > 35 Area Manager > Place a graphic report

 

Place a graphic report

 

The Area Manager has the ability to place a summary of your calculated data directly in your project.


\arearep

 

Click "R" on the Area Report Manager toolbar

Click in your project the desired location

Select the master node you want to include in the report

You can set, rotation, X, Y position and border.

NOTE: The visibility tick box let you hide the item in your project wile remain saved.

NOTE: Show zone allows you to show the calculated zones in the graphic report.

Click OK.

Now your calculation is generated and placed inside your project.
 

Move the graphic report

To move the graphic report within your project, select the move button and click the new location within your drawing.